 Ply panelling delaminating in some areas- CVA to propose additional remedial works to rectify/ BRAC to provide budget costing for measures

 Ditto- decorated timber skirt required

Skirting cover panel requires new softwood cover where rotten

 Existing windows- frames to be replaced under contract

 Fascia panels replaced- awaiting decoration.

 Panel to be repaired

 Additional ply panel can be fixed internally to preserve existing fascia. CVA to forward proposals/ BRAC to provide costs as above
 BRAC suggested lining/ insulating areas of open stud partitioning to external walls. CVA to forward budget cost to school for comment.

 Existing ply panel to Male WC to be removed for investigation as damp/ condensation formed

 All remaining whiteboards/ equipment to be removed prior to decoration. CVA to request client to remove a.s.a.p.
 Ditto- see above

 Client to confirm whiteboard size/ fixing method/ model/ wiring schematic etc. to enable contractor to complete all containment under contract- urgent

Soil pipe/ minimum width of escape to be discussed with AIS. 1050mm required.