Site Visit 18.07.13
Fascia decorations to be completed
White paint around ramp to be completed
Redundant light fittings to be removed- areas made good
Ramp/ slabs complete
Redundant light fittings on fascia- ditto
Fire door keep shut signs required to all doors off of protected route only- to be applied to both leaves (where relevant) and both sides. Confirmed with AIS
Existing blind to be refitted- slightly undersized due to previous joinery- but should eliminate glare
Electrical works to be completed
Minor touching in of decorations- ceilings various locations as noted on site
Touch in decs over new door classroom 1
Rooflights- some eased- some broken and not repaired. BRAC to review if further repairs can be carried out
Ramp timber complete- awaiting strips to top surface
Decoration required around existing fan- Male WC
Friday, 12 July 2013
Snagging: Visit 1. 11.07.13
If alarm is redundant to be removed and fascia made good
Cill to have additional coat of paint
Low level fascia board to have additional layer of paint
High level fascia board to have additional layer of paint
Redo filler to patch repair and recoat with masonry paint
Block downpipe/cap
Handrails to be continuous- complete with mired radius
Ditto
Fix felt high level to flat roof
Complete solar film to EW.24 & EW.23
Complete fire rated glass installation EW.23
Denso tape/ low level repair to RWP
Remove nails to external cladding
Fix downpipe back to cladding
Secure board/ back mastic seal
Infill missing bead to window
Touch in decorations
Infill piece/cover panel to step
Touch in decorations
Stray cable to EW.05
Post to be removed by others after handover
Window bead missing to EW.04
Replace split batten
Replace cupped batten
Fill holes/remove brackets
Replace split batten
If bulkhead light is not operational to be removed
Softwood trim to be replaced as AI issued.
Softwood trim to be replaced as AI issued.
Ironmongery to be fitted to doors
Obscured film to be removed from window
Security alarm to be removed if redundant
Oil filled radiators to be fitted to classrooms NW.015 and NW.016
Dado trunking requires cover pieces to horizontal junctions
Skirting to be filled - CVA to issue instruction
Radiators to be cleaned
Doors to be repaired where veneer broken. Doors to be varnished
High level windows to NW0.14 to have solar film. CVA to instruct
Fire alarm to ED.07 cannot be relocated as containment has been constructed above. AIS to inspect.
Soffit to be redecorated
High level hole to light fitting to be filled
High level hole to light fitting to be filled
Cleaner's cupboard to be cleared and redecorated.
Cill to have additional coat of paint
Low level fascia board to have additional layer of paint
High level fascia board to have additional layer of paint
Redo filler to patch repair and recoat with masonry paint
Block downpipe/cap
Handrails to be continuous- complete with mired radius
Ditto
Fix felt high level to flat roof
Complete solar film to EW.24 & EW.23
Complete fire rated glass installation EW.23
Denso tape/ low level repair to RWP
Remove nails to external cladding
Fix downpipe back to cladding
Secure board/ back mastic seal
Infill missing bead to window
Touch in decorations
Infill piece/cover panel to step
Touch in decorations
Stray cable to EW.05
Post to be removed by others after handover
Window bead missing to EW.04
Replace split batten
Replace cupped batten
Fill holes/remove brackets
Replace split batten
If bulkhead light is not operational to be removed
Softwood trim to be replaced as AI issued.
Softwood trim to be replaced as AI issued.
Ironmongery to be fitted to doors
Obscured film to be removed from window
Security alarm to be removed if redundant
Oil filled radiators to be fitted to classrooms NW.015 and NW.016
Dado trunking requires cover pieces to horizontal junctions
Skirting to be filled - CVA to issue instruction
Radiators to be cleaned
Doors to be repaired where veneer broken. Doors to be varnished
High level windows to NW0.14 to have solar film. CVA to instruct
Fire alarm to ED.07 cannot be relocated as containment has been constructed above. AIS to inspect.
Soffit to be redecorated
High level hole to light fitting to be filled
High level hole to light fitting to be filled
Cleaner's cupboard to be cleared and redecorated.