Friday, 19 July 2013

Site Visit 18.07.13


Fascia decorations to be completed


White paint around ramp to be completed


Redundant light fittings to be removed- areas made good


Ramp/ slabs complete


Redundant light fittings on fascia- ditto


Fire door keep shut signs required to all doors off of protected route only- to be applied to both leaves (where relevant) and both sides. Confirmed with AIS


Existing blind to be refitted- slightly undersized due to previous joinery- but should eliminate glare


Electrical works to be completed


Minor touching in of decorations- ceilings various locations as noted on site


Touch in decs over new door classroom 1


Rooflights- some eased- some broken and not repaired. BRAC to review if further repairs can be carried out

Ramp timber complete- awaiting strips to top surface

Decoration required around existing fan- Male WC